{
  "metadata": {
    "title": "Dated public evidence for social risk cases",
    "checked": "2026-10-11",
    "interpretation": "Selected descriptive evidence, not a representative sample or causal dataset. Project plans, historical report observations and official village statistics have distinct reference periods."
  },
  "abadi_design": [
    {"label": "2013 floating concept", "mtpa": 2.5, "status": "Planned capacity", "source": "https://www.inpex.com/english/news/english/news/assets/pdf/e20130123.pdf", "location": "23 January 2013 release, page 2"},
    {"label": "2019 onshore scheme", "mtpa": 9.5, "status": "Planned capacity; revised in 2023 to incorporate CCS", "source": "https://www.inpex.com/english/business/project/abadi.html", "location": "Project history and production capacity"}
  ],
  "tanimbar_access": {
    "source": "https://mtbkab.bps.go.id/id/publication/2025/09/26/00959a8bb8eec1390499172a/kecamatan-tanimbar-selatan-dalam-angka-2025.html",
    "provider": "BPS Kabupaten Kepulauan Tanimbar",
    "publication": "Kecamatan Tanimbar Selatan Dalam Angka 2025",
    "publication_release": "2025-09-26",
    "source_pdf_sha256": "a593245175699e52f6b88fcb90a1e1f0ff76f38da1123689b5547234a17b2070",
    "observation": "Pendataan Potensi Desa (Podes) 2024",
    "population_location": "Table 3.1, printed page 26, PDF page 48 (1-based); continued table and source on printed page 27, PDF page 49 (1-based)",
    "distance_location": "Table 1.2, printed page 8, PDF page 30 (1-based)",
    "units": {"population": "persons", "district_km": "km to district capital", "regency_km": "km to regency capital"},
    "selection": "Six named villages/urban wards to illustrate variation in population and distance. Not all villages, all project-affected places or a probability sample.",
    "limitations": "Published distance is not measured travel time, fare, transport reliability or exclusion. No join to historical geography or causal estimate is made.",
    "villages": [
      {"village": "Lermatang", "population": 1445, "district_km": 23, "regency_km": 25},
      {"village": "Latdalam", "population": 3186, "district_km": 35, "regency_km": 37},
      {"village": "Matakus", "population": 544, "district_km": 8, "regency_km": 19},
      {"village": "Sifnana", "population": 2582, "district_km": 1, "regency_km": 1},
      {"village": "Saumlaki", "population": 10800, "district_km": 3, "regency_km": 1},
      {"village": "Olilit", "population": 5212, "district_km": 3, "regency_km": 3}
    ]
  },
  "weda_2010": {
    "source": "https://www.miga.org/sites/default/files/archive/Documents/WBN_FAQs_9_Aug_2010.pdf",
    "location": "FAQ posted 10 August 2010 (filename differs), question 12, page 6",
    "source_sha256": "bfcf4ea46cb499237a1c56a4d4841432bf8b520eff6a01ac85762e484a160c84",
    "concession_ha": 54874,
    "planned_30_year_footprint_ha": 2650,
    "interpretation": "Planned cumulative mining/support footprint divided by the historical concession; neither observed clearing nor a share of affected people."
  },
  "compensation_observations": {
    "source": "https://www.adb.org/sites/default/files/publication/161391/safeguard-implementation.pdf#page=131",
    "publication_year": 2015,
    "location": "Printed page 120, PDF page 131 (1-based)",
    "observation_dates": "Not specified for these observations; reported in the 2015 publication",
    "denominator": "Share of compensation reported paid; the source does not supply household counts or a common monetary denominator for pooling.",
    "cases": [
      {"name": "Dibrugarh waste site", "paid_percent": 75, "constraint": "Lack of counterpart funding"},
      {"name": "Bihar Highways II greenfield", "paid_percent": 80, "constraint": "Document verification pending"}
    ]
  }
}
