Risk assessment

Definition

Risk assessment is a systematic examination of potential harmful events or conditions, their likelihood and their consequences for people or the environment; it supports decisions about prevention, mitigation and monitoring while making relevant uncertainties explicit.

Discussion

This definition states the meaning used in this application. The earlier entry is retained below; the source passages and their policy-specific wording remain separate.

Earlier application wording and discussion

Risk assessment: An instrument for estimating the probability of harm occurring from the presence of dangerous conditions or materials at a project site. Risk represents the likelihood and significance of a potential hazard being realized; therefore, a hazard assessment often precedes a risk assessment, or the two are conducted as one exercise. Risk assessment is a flexible method of analysis, a systematic approach to organizing and analyzing scientific information about potentially hazardous activities or about substances that might pose risks under specified conditions. The Bank routinely requires risk assessment for projects involving handling, storage, or disposal of hazardous materials and waste, the construction of dams, or major construction works in locations vulnerable to seismic activity or other potentially damaging natural events. For certain projects, the EA report may consist of the risk assessment alone; in other cases, the risk assessment is part of the EA documentation.

Sources

Asian Infrastructure Investment Bank. 2024. Environmental and Social Framework. Amended June 26. Beijing: Asian Infrastructure Investment Bank.

Definition

World Bank. 1999. “Annex A: Definitions.” Operational Policy 4.01: Environmental Assessment. Revised February 2011. Washington, DC: World Bank. User-supplied retained PDF.

Definition

An instrument for estimating the probability of harm occurring from the presence of dangerous conditions or materials at a project site. Risk represents the likelihood and significance of a potential hazard being realized; therefore, a hazard assessment often precedes a risk assessment, or the two are conducted as one exercise. Risk assessment is a flexible method of analysis, a systematic approach to organizing and analyzing scientific information about potentially hazardous activities or about substances that might pose risks under specified conditions. The Bank routinely requires risk assessment for projects involving handling, storage, or disposal of hazardous materials and waste, the construction of dams, or major construction works in locations vulnerable to seismic activity or other potentially damaging natural events. For certain projects, the EA report may consist of the risk assessment alone; in other cases, the risk assessment is part of the EA documentation.